June 14, 2016

    Ride The Rockies Day 1-2 Update

    Ride The Rockies 2016 is well underway!

     We rode from Carbondale to Aspen on Day 1, which is the easiest day of the ride (50 miles and 4200 ft. of elevation). Team Samaritan House began the ride with a bang, picking up donations and pledges from generous cyclists and spectators along the route. As an added bonus a very humble Lance Armstrong gave a terrific cycling clinic in the afternoon – a real treat!

    Day 2 was a lot tougher – We rode 85 miles from Aspen to Copper Mountain climbing a total of 7500 vertical ft. in elevation along the way! Most of this climbing took place as we rode over Independence Pass and through Leadville over Freemont Pass before dropping into Copper. That was a great descent after all of that climbing!

    Ride The Rockies

    A special thanks to a new corporate sponsor of Team Samaritan out of Denver; Greenburg Traurig, LLP!

     

    About the Author – Kevin Dooley

    Kevin

    Kevin is a 25-year veteran of technology/SI/and Outsourcing sales and sales leadership. He joined Accenture in 2009 in an Executive role within the Communications, Media, and Technology vertical. He most recently had global responsibility for Accenture’s relationship with a $24B distributor and Accenture’s largest multi-national Dynamics AX implementation engagement. Prior to joining Accenture, Kevin held similar positions with EDS and Hewlett Packard managing large outsourcing transactions, global integration and ERP implementation projects, as well as CRM and Channel Development consulting.

    Enavate Recent Posts

    October 16, 2025

    What You Can Expect at Community Summit NA 2025—with Enavate Leading the Way

    Dynamics Community Summit North America 2025 is around the corner, and this year promises to be one of the most exciting yet. As the largest independent gathering in the... Read More
    October 8, 2025

    Making GP Smarter with Enavate AI

    Microsoft Dynamics GP has long been the standard for ERP platforms, able to power an entire business in one seamless solution. With the recent release of cloud-first ERP... Read More
    September 25, 2025

    Dynamics GP End-of-Life: What We Know Now and What You Should Do Next

    On September 25, 2024, Microsoft announced their end-of-life plans for Dynamics GP (Great Plains). Read More

    Subscribe to Receive Email Updates