February 18, 2019

    Enavate Solution Architect Shares Lessons Learned From PCL Project

    When PCL Construction decided to move its configuration and master data from Microsoft AX to Dynamics 365, they called on ENAVATE to help guide the transfer. The project, which required extensive customization, took 18 months, involved 40 developers, architects, business analysts and project managers. It was a complex project that provided plenty of opportunity for real-world learning.

    Next month, ENAVATE Sales Solution Architect Eugene Tsuprenko, joined by Kaare Boraas, PCL relationship manager, will share the wisdom they gained with participants at User Group Focus, to be held in Houston, March 11-12.

    In two sessions, they will provide a case study of the project and cover several keys to assuring project success, including

    • Team structure for the project
    • Process, including requirements collection by BAs and SMEs, backlog creation, backlog elaboration, development, testing, and deployment. 
    • Dynamics 365 and Azure infrastructure including: environment topology, deployment and builds, data management (gold configurations and data automation), and integration process

    User Group Focus provides an opportunity for concentrated Microsoft Dynamics 365 and Power Platform learning through 90-minute, deep-dive, advanced-level sessions presented by technical and functional experts.

    Learn more about the User Group Focus conference.

    Enavate Recent Posts

    September 25, 2025

    Dynamics GP End-of-Life: What We Know Now and What You Should Do Next

    On September 25, 2024, Microsoft announced their end-of-life plans for Dynamics GP (Great Plains). Read More
    September 23, 2025

    From Setup to Retirement: Getting More Out of GP’s Fixed Asset Module

    As budgets get tighter, it’s more important than ever to make the most of the business systems and tools you already have in place. Read More
    September 18, 2025

    From Ford’s EV Overhaul to Your Factory Floor: AI-Powered ERP for Smarter Manufacturing

    Key Takeaways for Manufacturers Ford is reinventing its century-old assembly line to be an “assembly tree” supporting a $5B electric vehicle (EV) production strategy,... Read More

    Subscribe to Receive Email Updates